There are 2 other images of this object. See our image rights statement.
See more objects with the color darkgrey grey darkslategrey saddlebrown or see all the colors for this object.
Object Timeline
|
|
2010 |
|
2015 |
|
2025 |
|
Jiading Bridge (unbuilt)
This is a Jiading Bridge (unbuilt). It was designed by Heatherwick Studio and Thomas Heatherwick. It is dated 2010.
How can a traditional Chinese moon bridge meet today’s standards of accessibility?
The studio adapted the elegant S-curves of historical Chinese moon bridges to design a 65-foot-long waterway span for the Shanghai satellite town of Jiading. The hydraulic-powered bridge is constructed from threaded C-shaped sections: they flatten for wheelchairs and rear up into a hump, with pedestrian stairs, for passing boats underneath. Unlike a conventional drawbridge, this bridge is crossable in any position — up, down, or in between. The contrasting materials of the sections— exterior machined steel and interior bronze —visually accentuate the bridge’s transformative movement.
It is credited Courtesy of Heatherwick Studio.
- Rolling Bridge
- painted mild steel, stainless steel cable, wood, aluminum.
- Courtesy of Heatherwick Studio.
- HSP.12
- Large Span Rolling Bridge (not Yet Realized)
- Courtesy of Heatherwick Studio.
- HSP.26
- Garden Bridge
- Courtesy of Heatherwick Studio.
- HSP.42
This object was previously on display as a part of the exhibition Provocations: The Architecture and Design of Heatherwick Studio.